Parallel cables 2 meters – AP SYSTEMS battery 5.12kWh 51.2V – Long-distance connection

Reference: CAB-APS-2M Dimensions: 2m
7 people are viewing this product right now
Long-distance parallel cable 2m for AP SYSTEMS APbattery 5.12kWh batteries – French assembly 🇫🇷 – Amphenol SURLOK
Compatibility

Compatible with: APbattery 5.12kWh – 51.2V – 100Ah battery (APsystems). Parallel connection up to 32 units (163.84 kWh max). Compatible with APstorage ELS-5K (single-phase) and ELT-12K (three-phase) systems. Battery communication via CAN, RS485, Wi-Fi. IP65 certification – indoor and outdoor installation.

65 €
Price incl. VAT | 1.20 kg
In stock (20 available)
Delivery 24/48h | Shipped today if ordered before 3pm

Main features :

  • Length: 2 meters
  • Cross-section: 25 mm²
  • Connectors: Amphenol SURLOK
  • Current supported: 60A rated (100Ah / 0.6C)
  • High-conductivity tinned copper
  • Insulation: resistant up to 105°C
  • Flexible multi-strand cable
  • Assembly: Manual, in France 🇫🇷
  • Crimping: Certified hydraulic
  • Contact resistance: < 0.5mΩ
Fast delivery
24-48h
2 year guarantee
French customer service
Secure payment
Card, PayPal, transfer
Technical support
Experts available
Secure payments : Visa Mastercard PayPal Bank transfer

Key points

  • Authentic Amphenol connectors
  • 25mm² cable section for maximum conductivity
  • Compatible with Pylontech, BYD and Goodwe batteries
  • Compliant with European safety standards

Quick installation guide

Long-distance installation: 1. Plan the cable routing between APbattery units avoiding heat sources. 2. Disconnect all AP SYSTEMS batteries. 3. Route the flexible cable avoiding tight bends (minimum recommended bend radius: 10x cable diameter). 4. Connect the red (positive) cable to the + terminals of both APbattery units. 5. Connect the black (negative) cable to the – terminals of both APbattery units. 6. Check the locking of the Amphenol SURLOK connectors. 7. Restore power and check BMS communication (CAN / RS485) and balancing via the APsystems app.

Frequently asked questions

  • Compatible with which AP SYSTEMS battery? APbattery 5.12kWh – 51.2V / 100Ah
  • How many batteries can be connected in parallel? Up to 32 units (163.84 kWh max)
  • Are losses greater over 2m? No, the 25mm² cross-section is oversized relative to the 60A rated current – negligible losses
  • Difference with the 1m version? Doubled length for installations with distant batteries or in separate rooms
  • Compatible with ELS-5K and ELT-12K? Yes, communication runs via the CAN port independently of the power cable
  • Is the assembly really French? Yes, hydraulic crimping done in our workshops 🇫🇷
  • Delivered ready to use? Yes, pre-assembled and tested connectors
2 year guarantee
Returns within 14 days
Technical support

2-meter parallel connection cables for long-distance interconnection between AP SYSTEMS APbattery 5.12kWh (51.2V / 100Ah) batteries. Ideal for installations where the batteries are not adjacent, in separate cabinets, or with space constraints. The APbattery is IP65-rated and can be installed indoors or outdoors; this 2m cable offers the flexibility needed for any configuration.

Why 2 meters for the APbattery 5.12kWh?

The APbattery 5.12kWh weighs 50 kg and measures 460×165×652 mm. In installations with multiple units (up to 32 in parallel for 163.84 kWh), batteries can be spread across several locations. These 2m cables provide the necessary flexibility without compromising electrical performance thanks to the 25mm² cross-section.

Kit contents:

  • 1 positive (red) cable, 25mm² – 2 meters with Amphenol SURLOK connector
  • 1 negative (black) cable, 25mm² – 2 meters with Amphenol SURLOK connector
  • Pre-assembled and tested connectors – ready to plug in

Certified French assembly:

  • Hydraulic crimping performed with certified tooling 🇫🇷
  • High-conductivity tinned copper – minimal losses over the length
  • Reinforced insulation resistant up to 105°C
  • Flexible multi-strand cable for easy installation

Recommended uses

Long-distance parallel connection between APbattery 5.12kWh batteries in separate locations. Residential and commercial installations with geometric or space constraints. APstorage ELS-5K / ELT-12K systems with spread-out batteries. Cable replacement on existing AP SYSTEMS installations requiring extra length.

Did you know?

Long-distance parallel cables assembled in France for AP SYSTEMS APbattery 5.12kWh 51.2V batteries. Amphenol SURLOK connectors, 2 meters, certified hydraulic crimping. Compatible with ELS-5K and ELT-12K.

Everything you need to know about parallel cables 2 meters – ap systems battery 5.12kwh 51.2v – long-distance connection

Why choose high quality cables?

Parallel cables for batteries require optimal conductivity to ensure the efficiency of your energy storage system.

French assembly - A guarantee of quality

All our cables are assembled in France by qualified technicians. Each connection is carefully crimped to current standards, and every product undergoes rigorous quality control before shipping. This means you get a reliable, durable solution for your installation.

Recommended applications

These cables are perfectly suited for:

  • Residential solar installations with energy storage
  • Off-grid systems requiring reliable batteries
  • Hybrid setups combining grid power and autonomy
  • Expansions of existing storage capacity

Guaranteed compatibility

Our cables are compatible with all Pylontech lithium batteries (US2000, US3000, US5000), as well as equivalent BYD and Goodwe systems. Amphenol connectors ensure a perfect, secure connection.

Zoom
×

Availability notification

Receive an email as soon as this product is available again.